Running Cost Analysis
Audi e-tron Running Cost in Pune
Same as Mumbai (MSEDCL). Cost per km, monthly spend, and savings vs a petrol equivalent.

Your Driving Profile
Per km
₹1.87
Per day
₹75
Per month
₹2,240
Per year
₹27,253
5-Year Savings vs Petrol
₹3,69,870
Petrol equivalent (15 km/l @ ₹104/L): ₹1,01,227/yr ·Audi e-tron: ₹27,253/yr
Monthly saving
₹6,165
Yearly saving
₹73,974
Lifetime (10 yrs)
₹7,39,740
Pune Electricity Tariffs
- Home AC charging₹9.5/kWh
- Public DC fast₹18/kWh
- Blended rate₹11.20/kWh
- Petrol price₹104/L
Audi e-tron Efficiency
- ARAI range300 km
- Real-world range240 km
- Battery40 kWh
- Efficiency0.167 kWh/km
FAQs - Audi e-tron Running Cost in Pune
How much does it cost to charge Audi e-tron in Pune?
At Pune home tariff of ₹9.5/kWh, a full charge from empty costs about ₹380. A 0-80% charge: ₹304.
How much will I save vs a petrol car?
Driving 40 km/day, you'll save approximately ₹6,165/month or ₹73,974/year vs a petrol car doing 15 km/l.
Does DC fast charging cost more?
Yes - DC fast charging in Pune is about ₹18/kWh vs ₹9.5/kWh at home. Plan daily charging at home and use DC only for travel.
How long will the battery last?
EV batteries typically last 8-12 years with regular use. Most manufacturers offer an 8-year/160,000 km battery warranty covering significant capacity loss.
See all running costs for Pune
Full TCO: EMI + insurance + maintenance + charging for 5 years.