MeraEV
    HomeMaruti Suzuki WagonR ElectricRunning Cost in Mumbai

    Running Cost Analysis

    Maruti Suzuki WagonR Electric Running Cost in Mumbai

    Higher tariff, dense DC network. Cost per km, monthly spend, and savings vs a petrol equivalent.

    Maruti Suzuki WagonR Electric

    Your Driving Profile

    10 km200 km
    All DC fastAll AC home

    Per km

    ₹1.40

    Per day

    ₹56

    Per month

    ₹1,680

    Per year

    ₹20,440

    5-Year Savings vs Petrol

    4,03,935

    Petrol equivalent (15 km/l @ ₹104/L): ₹1,01,227/yr ·Maruti Suzuki WagonR Electric: ₹20,440/yr

    Monthly saving

    6,732

    Yearly saving

    80,787

    Lifetime (10 yrs)

    8,07,870

    Mumbai Electricity Tariffs

    • Home AC charging9.5/kWh
    • Public DC fast18/kWh
    • Blended rate11.20/kWh
    • Petrol price104/L

    Maruti Suzuki WagonR Electric Efficiency

    • ARAI range300 km
    • Real-world range240 km
    • Battery30 kWh
    • Efficiency0.125 kWh/km

    FAQs — Maruti Suzuki WagonR Electric Running Cost in Mumbai

    How much does it cost to charge Maruti Suzuki WagonR Electric in Mumbai?

    At Mumbai home tariff of ₹9.5/kWh, a full charge from empty costs about ₹285. A 0-80% charge: ₹228.

    How much will I save vs a petrol car?

    Driving 40 km/day, you'll save approximately ₹6,732/month or ₹80,787/year vs a petrol car doing 15 km/l.

    Does DC fast charging cost more?

    Yes — DC fast charging in Mumbai is about ₹18/kWh vs ₹9.5/kWh at home. Plan daily charging at home and use DC only for travel.

    How long will the battery last?

    EV batteries typically last 8-12 years with regular use. Most manufacturers offer an 8-year/160,000 km battery warranty covering significant capacity loss.

    See all running costs for Mumbai

    Full TCO: EMI + insurance + maintenance + charging for 5 years.

    Maruti Suzuki Maruti Suzuki WagonR Electric Running Cost in Mumbai 2026 — Cost per Km, Monthly Savings vs Petrol | MeraEV